Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on " Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** The project consists of the removal and replacement of two pedestrian bridges that provide access to the guestroom
building adjacent to the park Lodge. The new bridges will be constructed of structural steel with cast- in- place concrete walking surfaces. Both bridges will be covered with
roofs constructed of wood
trusses bearing on structural steel framing, with plywood sheathing and shingle
roofing. One bridge will tie into the existing structure of both the Lodge and the guestroom
building, while the other will be structurally independent and have an expansion joint where it meets the guestroom
building. New lighting and sprinklers will be installed within the
roof structure of both bridges. The project also includes removal and replacement of two sets of cast- in- place concrete stairs that lead from the parking lot down to the first floors of the guestroom
building and Lodge, as well as replacement of a steel pipe railing behind the lodge that provides protection for an existing segmental site retaining wall.