Lot 1: *** ONLY ONLINE BIDS WILL BE ACCEPTED FOR THIS RFB. *** Emailed and hard copies delivered by any method WILL NOT BE ACCEPTED. On this line, Bidders must enter $ 0. 00 for Contract Amount in the e- procurement system. Actual Contract Amount must be entered on "
Official Bid Document" and submitted as an attachment in the e- procurement system. Vendors should review and update, if necessary, all addresses and contact persons for their account prior to bid submission. This information will carry forward to a contract if awarded, therefore please ensure all information is correct. ** Entire
Official Bid Document and Bid Bond ( if required) should be combined as one PDF and uploaded** Project is for the replacement of
HVAC systems and equipment in various buildings as follows: Walter Prater Building: Conversion from water loop heat pump system to Self- contained AC Units with Energy Recovery BARD type units in each classroom. Office areas will be served by VRF based system. All areas will receive new lighting and ceilings. In lower level, walls will be removed in old
kitchen areas to make a large open space. Addition of restroom and scrub area in lower level. Door closers will be installed on all doors in corridors throughout building. Heavy Equipment Building: Project includes the
HVAC replacement of existing multizone rooftop unit serving classrooms and miscellaneous areas with new VAV rooftop unit and VAV boxes. Larger garage
workshop space will be equipped with a new rooftop unit to serve the space. In the
workshop existing garage doors will be replaced with new insulated garage doors. Existing Federal Pacific electrical panels will be replaced with new panels in same location including the MDP. Challenger Center: Replacement of evaporative cooler and related controls. First Federal Building: Upgrade controls in three large rooms.