CIP- **** Parris Island ( PI) 16- inch Steel Water Transmission Main Replacement ( Malecon Drive) - Phase I: Installation of approximately 12, 200 linear feet of 16- inch Polyethylene liner inside of an existing 16- inch steel waterline and other related required for complete installation.
16inch steel water transmission main replacement Installation of approximately 12, 200 linear feet of 16inch polyethylene liner inside of an existing 16inch steel waterline and other related required for complete installation. Installation of approximately 1, 625 linear feet of 16inch fusible pvc installed by horizontal directional drill hdd on both sides of archer creek bridge to replace and existing 16inch waterlines suspended from the bridge and 170 linear feet of 16inch pvc installed by open cut.