Lot 2: Access Road Improvements - Mobilization - Demolition - Remove Existing Vegetation to a 2" Depth - Demolition - Rip Area to a 12" Depth - Demolition - Saw Cut Existing Asphalt - Demolition - Remove Existing Concrete Curb - Demolition - Remove Existing Asphalt and Base - Demolition - Remove Existing Tree and Root Ball - Demolition - Remove Existing
Irrigation, Identify and Cap Systems to be Reused - Demolition - Remove Existing Chain Link Fence and Footings - Site Grading - Soil Import and Placement - Site Grading - Rough Grade - Site Grading - Fine Grade - Site
Drainage - SDR- 35 Bell end Gasket Storm Drain Line - Site
Drainage - Brooks Concrete Catch Basin - Site
Drainage - Concrete Rip Rap
Drainage Outlet - Site
Drainage - 8 039; x8 039; x4 039; With 3/4" Crushed Rock Cistern with Catch Basin and Mirifi Fabric - Site Improvements - Type A2- 150( 6") Concrete Curb and Gutter - Site Improvements - Type A1- 150( 6") Concrete Curb - Site Improvements - Modify Existing
Irrigation for New Improvements - Site Improvements - 3. 5" Thick Asphalt Over 8" Compacted Aggregate Base - Site Improvements - 6" Thick Concrete Drive Apron for Heavy Vehicle Access - Site Improvements - 4" Thick Reinforced Natural Gray Concrete Flatwork, Medium Broom Finish - Site Improvements - 6 039; Galvanized Chain Link Fence in 12" x6" Reinforced Concrete Mow Curb - Site Improvements - 6" Reinforced Concrete Retaining Curb - Site Improvements - 12 039; Wide Galvanized Chain Link SCE Vehicle Access Gate - Site Improvements - 10 039; Wide Galvanized Chain Link Maintenance Gate - Site Improvements - Sports Themed Art Pieces in Roundabout - Site Improvements -
Solar Powered Pedestrian Crosswalk Signs and System Controls - Site Improvements - Removable Bollards - Site Improvements - Paint Access Road Striping and Crosswalk Striping - Site Improvements - All " No Parking" and One Way Street Signs - Site Improvements - Paint Red Curbs - Site Improvements - SWPP Compliance - Site
Landscape - All Soil Amendments - Site
Landscape - New Lands
Lot 3: Parking Lot Improvements - Mobilization - Site Demolition - Remove Existing Vegetation to a 2" Depth - Site Demolition - Rip Area to a 12" Depth - Site Demolition - Saw Cut Existing Concrete or Asphalt - Site Demolition - Remove Existing Concrete Curb, Gutter and Sidewalk - Site Demolition - Remove Existing Asphalt and Base - Site Demolition - Remove Existing
Solar Light Pole and Footing - Site Demolition - Remove Existing Chain Link Fence and Footing - Site Grading - Soil Import and Placement - Site Grading - Rough Grade - Site Grading - Fine Grade - Site Grading - Bioswale and
Drainage Area - Site
Drainage - SDR- 35 Bell End Gasket Storm Drain Line - Site
Drainage - Brooks Concrete Catch Basin - Site
Drainage - 8 039; x8 039; x4 039; With 3/4" Crushed Rock Cistern with Catch Basin and Mirifi Fabric - Site
Drainage - 24" x7" Reinforced Concrete Swale - Site Improvement - Type A2- 150( 6") Concrete Curb and Gutter - Site Improvement - Type A1- 150( 6") Concrete Curb - Site Improvement - 3" Thick Asphalt Over 4" Compacted Aggregate Base - Site Improvement - 3. 5" Thick Asphalt Over 8" Compacted Aggregate Base - Site Improvement - 4" Thick Reinforced Natural Gray Concrete Flatwork, Medium Broom Finish - Site Improvement - Accessible Ramp with Handrails - Site Improvement - 6 039; Galvanized Chain Link Fence in 12" x6" Reinforced Concrete Mow Curb - Site Improvement - 6" Reinforced Concrete Retaining Curb - Site Improvements - All Parking Lot Entry, Accessible Parking and Electric Vehicle Parking Signs and Installation - Site Improvement - All " No Parking" Signs - Site Improvement - Paint All Parking Stalls - Site Improvement - Paint Vehicle Stop Sign - Site Improvements - Paint Red Curbs - Site Improvements - Parking Stall Wheel Stop - Site Improvements - Relocate Existing
Solar Light Pole - Site Improvements - Masonry Trash Enclosure - Site Improvements - SWPPP Compliance - Site
Landscape - All Soil Amendments - Site
Landscape - New
Landscape Plant Material - Site
Landscape - New
Irrigation Systems - Sit