BR- 019- 2( 072) Seismic Retrofit of Kaholo Stream Bridge-
(. . . ) 203 Excavation and Embankment 2031a 2032a Excavation and Backfill for Bridge and 205 **** Retaining Structures Temporary Water Pollution, Dust, and Erosion 209 **** **** Control DIVISION 500 STRUCTURESSection Description Pages 503 Concrete Str (. . . )
(. . . ) **** **** 641 HydroMulch Seeding **** 645 Work Zone Traffic Control **** Portable Concrete Barrier and end Treatment 651 **** **** System Drilling Holes and Installing Dowel Reinforcing 656 **** Bars 657 Soil Nails **** **** 6 (. . . )
(. . . ) that the282 Contractor has satisfactorily completed all contract work in compliance with the283 contract including all plant establishment requirements, and all the materials have284 been accepted by the State.
Nonproportionate ratio of DBEs normal capacity to size of contract and quantity of material to be provided under the contract **** Before backfilling with earth or other materials against the joints, all872 construction, expansion, contraction, and control joints must be waterproofed873 with flashing compound waterproofing as detailed in the St (. . . )
HIePRO OFFER DUE DATE TIME is November 21, 2024, at 2: 00 **** State Waters All waters, fresh, brackish, or salt, around and within the State, 442 including, but not limited to, coastal waters, (. . . )
(. . . ) operational and safety devices have been installed in accordance480 with the contract documents including guardrails, end treatments, 481 traffic barriers, required signs and pavement markings, drainage, 482 parapet, and bridge and pavement struct (. . . )
(. . . ) or otherwise, and may take751 possession of, and utilize in completing the work, the materials, appliances, 752 and plants as may be on the site of the work and necessary therefore.
Dead loads, live loads, and373 member capacities for the work access platform shall comply with an374 appropriate nationally recognized design code or guide specif (. . . )