Lot 3: Parking Lot Improvements - Mobilization - Site Demolition - Remove Existing Vegetation to a 2" Depth - Site Demolition - Rip Area to a 12" Depth - Site Demolition - Saw Cut Existing Concrete or Asphalt - Site Demolition - Remove Existing Concrete Curb, Gutter and Sidewalk - Site Demolition - Remove Existing Asphalt and Base - Site Demolition - Remove Existing
Solar Light Pole and Footing - Site Demolition - Remove Existing Chain Link Fence and Footing - Site Grading - Soil Import and Placement - Site Grading - Rough Grade - Site Grading - Fine Grade - Site Grading - Bioswale and Drainage Area - Site Drainage - SDR- 35 Bell End Gasket Storm Drain Line - Site Drainage - Brooks Concrete Catch Basin - Site Drainage - 8 039; x8 039; x4 039; With 3/4" Crushed Rock Cistern with Catch Basin and Mirifi Fabric - Site Drainage - 24" x7" Reinforced Concrete Swale - Site Improvement - Type A2- 150( 6") Concrete Curb and Gutter - Site Improvement - Type A1- 150( 6") Concrete Curb - Site Improvement - 3" Thick Asphalt Over 4" Compacted Aggregate Base - Site Improvement - 3. 5" Thick Asphalt Over 8" Compacted Aggregate Base - Site Improvement - 4" Thick Reinforced Natural Gray Concrete Flatwork, Medium Broom Finish - Site Improvement - Accessible Ramp with Handrails - Site Improvement - 6 039; Galvanized Chain Link Fence in 12" x6" Reinforced Concrete Mow Curb - Site Improvement - 6" Reinforced Concrete Retaining Curb - Site Improvements - All
Parking Lot Entry, Accessible
Parking and Electric Vehicle
Parking Signs and Installation - Site Improvement - All " No
Parking" Signs - Site Improvement - Paint All
Parking Stalls - Site Improvement - Paint Vehicle Stop Sign - Site Improvements - Paint Red Curbs - Site Improvements -
Parking Stall Wheel Stop - Site Improvements - Relocate Existing
Solar Light Pole - Site Improvements - Masonry
Trash Enclosure - Site Improvements - SWPPP Compliance - Site Landscape - All Soil Amendments - Site Landscape - New Landscape Plant Material - Site Landscape - New Irrigation Systems - Sit