Justice, Department Of- Federal Prison System / Bureau Of Prisons- Fao
FCI Milan - Emergency Surface Blowdown Heat Recovery/DA Controls - 12/9/2025: Amendment **** issued. This amendment incorporates mechanical/piping layouts, photo sheet, extending Bid Opening Due Date to Monday, December 22, 2025 at 12: 30 PM EST. See attachments for details. 12/1/2
Emergency Surface Blowdown Heat Recovery DA Controls Contractor will provide a temporary surge deaerator system in order to maintain continuous steam service to fci milan. the furnishings of this system will include all piping, valves, tie in points, and chemical treatment to include the labor for installation and removal of the system. Contractor will remove the existing combined surge and deaerator tank from the central utility plant and dispose of the tank properly. Contractor is to provide all equipment, materials and labor force necessary to remove. Contractor will provide a two tank system. stainless surge tank and a d a system in order to maintain continuous steam service to fci milan. the furnishing of this system will include all schedule 80 piping, forged fittings, valves, tie in points, controls, wiring, and labor for installation. The surge tank will also have the capability to be utilized to by pass the deaerator tank to provide feed water to the boilers during an inspection or failure of the dea
Bid Close Date: